The Future Homes Standard: MVHR is now essential in new builds
From March 2027, new homes in England must meet the Future Homes Standard — published into law in March 2026. Homes built to comply will need to be significantly more airtight than current standards require, making MVHR the standard ventilation solution, not an optional upgrade.
We are now taking bookings for FHS-compliant MVHR projects in 2026 and 2027.
A recent project: Broadlease, Edington, Somerset
What this means for your project — and how we can help
MVHR needs to be designed in early — duct routes affect structural decisions made before the roof goes on
We work directly from your architect's drawings at design stage, producing flow rates, duct layouts and equipment schedules your structural team can coordinate against
Leaving ventilation as an afterthought leads to compromised duct routes, higher costs and compliance risk at commissioning
Projects with planning applications submitted before March 2027 may qualify for transitional arrangements — but designs should specify MVHR as standard now
We supply, install, commission and certify the complete system across Somerset, Bath and Bristol
A two-bedroom bungalow designed and built by Dodden — fabric, structure and MVHR integrated from day one. Delivered on time and on budget at £140,000.
As-built results:
Airtightness: 0.5 m³/h.m² @ 50Pa — Very Good
EPC rating: B (81), potential A (114)
Primary energy: 51 kWh/m²/year
CO2: 0.3 tonnes/year (national average: 6 tonnes)
Running costs: ~£502/year